Thursday, June 23, 2011

Day 2: The Hole

Even though we are providing all of the materials for the Soilet, we have the locals contribute by having them do some of the labor, such as digging the hole. And they did a good job too.
Then we finished it off by digging the trench for the liquid drainage.

No comments:

Post a Comment